Utilities Solution

Mesh Monitoring for Building Engineering Systems

A self-organizing wireless mesh network for heat, water, and electricity monitoring in multi-apartment buildings — no subscription, no cable runs, no monthly fees.

Download Presentation
1–3 mo. Payback period
~1 600 USD Per building
15–25% Heat savings
0 $/mo. Subscription

Why traditional approaches fail

🔧

Opaque metering

Property managers have no visibility into actual consumption per building — only estimated normatives.

Overpayment up to 40%
⚠️

Failures without warning

Pipe bursts, freezing, electrical overloads — discovered only after damage has occurred.

Response: hours to days
💸

Expensive infrastructure

Wired monitoring systems require thousands of meters of cable and structural disruption.

6–10 $/m of cable
📡

LoRaWAN gateways — single point of failure

Centralized gateways: failure of one device disconnects an entire monitoring segment.

100% dependency
📱

No data for residents

Tenants cannot see real-time consumption or dispute meter readings.

Complaints +30%
The device at the heart of the solution

ROSSMA IIOT-AMS MeshSens
Device photo

ROSSMA IIOT-AMS

IIOT-AMS MeshSens

Wireless multi-function data acquisition node

ROSSMA IIOT-AMS MeshSens is an industrial IoT node with built-in Mesh topology support at 868 MHz. Each device simultaneously acts as a sensor, repeater, and router — delivering fault tolerance without a central gateway.

  • Radio interface Mesh 868 MHz, AES-128, OTA updates
  • Wired inputs RS-485 / Modbus, 4–20 mA, DI/DO
  • Power Battery up to 5 years / 5–30 V DC / solar
  • Protection IP65, −40 … +85 °C
  • Certificates EAC (Russia/EAEU), CE
  • Manufacturing Made in Russia
Learn more about the device

Mesh architecture — no single point of failure

Every node is a repeater. The network self-heals when any element fails.

Technical specifications

  • Frequency 868 MHz (ISM, no RF licence required)
  • Topology Full Mesh — up to 50 nodes/cluster
  • Node range 200–1 500 m (depends on urban density)
  • Power Battery up to 5 years or solar panel
  • Protection IP65, −40 … +85 °C
  • Interfaces RS-485 / Modbus, 4–20 mA, DI/DO
  • Encryption AES-128, OTA firmware updates

Mesh advantages

Self-healing

When a node fails, packets are automatically rerouted through neighbours.

Scalability

Adding new sensors requires no cabling or additional gateways.

No SIM cards

No monthly fees for NB-IoT / LTE-M cellular traffic.

Works offline

Local data storage in nodes when server connectivity is lost.

What the system monitors

🌡️

Heat meters

Integration with MULTICAL, VKT-7, ST-15 via M-Bus / RS-485. Archive, daily and hourly readings.

💧

Water meters

Cold and hot water: ultrasonic and pulse sensors. Leak detection via delta method.

Electricity

AMR/SCADA: per-phase metering, power factor, voltage sags, imbalance analysis.

🔥

Stairwell temperature

Air temperature monitoring in stairwells and basements. Pipe freeze prevention.

💨

System pressure

Pressure monitoring in DHW and heating mains. Automatic fault alarms.

🚪

IHP & CHP units

Monitoring of individual and central heat supply units.

Monitoring subsystems

  • Heat meter readings (VKT-7, MULTICAL 302/403, ST-15)
  • Supply and return temperature monitoring: T1, T2, ΔT
  • Heat carrier volume: V1, V2, ΔV — leak detection
  • Pipeline pressure P1 and P2
  • SCADA integration via Modbus TCP
  • Historical data: hourly / daily / monthly / yearly
  • Contract parameter violations — automatic alerts
  • Balance per building, stairwell, IHP
  • Ultrasonic and woltmann CWS and HWS meters
  • Per-apartment and per-stairwell water balance
  • Leak detection: delta method and statistical anomalies
  • Water supply network pressure monitoring
  • HWS temperature control ≥55 °C (sanitary standards)
  • Automatic meter reading transmission
  • Hourly archive; export to municipal utility platforms
  • Multi-tariff electricity metering (T1/T2/T3)
  • 3-phase monitoring: voltage, current, power factor, active power
  • Imbalance detection between main meter and flat sum
  • Voltage sag and overload recording
  • Common area lighting: fixture groups, violations
  • Automated lighting control (relays, dimmers)
  • AMR integration and billing system API

Project economics

Calculation for a typical 100-flat, 9-floor, 5-stairwell building

1–3 mo.
Payback period
~7 500
USD/year savings (min)
0 $
Monthly subscription
Savings category Current losses After deployment Savings/year
Heat (IHP imbalance) $2 500–3 300 $400–700 $2 100–2 600
CWS/HWS (leaks) $1 100–1 600 $200–350 $900–1 300
Electricity (common area) $1 600–2 500 $950–1 400 $700–1 100
Emergency repairs (avg) $2 700–4 100 $550–1 100 $2 200–3 000
TOTAL savings $7 900–11 500 $2 100–3 550 $7 500–18 000

Comparison with alternatives

Criterion ROSSMA Mesh LoRaWAN + Gateway NB-IoT / SIM Wired SCADA
Single point of failure ✓ None ✗ Gateway ✗ Operator ✗ Cable
Cable-free installation ✓ Yes ✓ Yes ✓ Yes ✗ No
Monthly fees ✓ None ~ Optional ✗ Yes ~ Minimal
Offline buffering ✓ Yes ~ Partial ~ Partial ✓ Yes
RS-485 / Modbus built-in ✓ Yes ~ Converter ✗ No ✓ Yes
Time to deployment ✓ 2–4 weeks ~ 4–8 weeks ~ 4–8 weeks ✗ 3–6 months
IP65, −40…+85°C ✓ Yes ~ Depends ~ Depends ~ Depends

✓ — advantage  |  ✗ — disadvantage  |  ~ — neutral / partial

Pilot project

Connect one building in 2–4 weeks and verify results before full deployment.

  • 10 wireless sensor nodes (standard configuration)
  • Integration with 1 heat meter (M-Bus / RS-485)
  • 1 CWS + 1 HWS meter connection
  • Cloud platform subscription (12 months free)
  • Mobile app for property manager dispatcher
  • Installation and commissioning — on-site engineer
  • Staff training (2 hours)
  • 90-day technical support

Pilot project cost

1 150
USD turnkey
  • 10 wireless nodes
  • 3 meters (heat + CWS + HWS)
  • Installation + training + support 90d
  • Cloud platform 12 mo. free

Cost is deducted from the full project budget if ordered within 30 days after pilot completion.

Implementation stages

01

Site audit

1–2 days

Survey of IHP units, heat substations, electrical panels. Sensor placement plan.

02

Design

3–5 days

Mesh topology calculation, equipment specification, approval with property management.

03

Installation

1–2 weeks

Node mounting, meter connections, mesh network configuration — no cable runs.

04

Launch

1–3 days

Platform activation, dashboard setup, staff training, initial performance report.

Ready to start monitoring?

Request a quote for your building — we will respond within one business day.

Contact Us

Success

Your email has been added to the mailing list

Subscribe to news

Weekly industry news digest